Close

Practical guide

How to quote RFQs faster at a machine shop or fab shop

Buyers want quotes in a day, but your estimator reads every drawing by hand. How Houston machine and fab shops can quote faster, and where AI fits.

An RFQ lands at 4pm: twelve PDF drawings, a material spec, and a cert requirement buried on page three. Your estimator already has nine in the queue. By the time the quote goes out on Thursday, the buyer has placed the order somewhere else.

This guide covers how fast buyers expect quotes, where quoting time really goes, what to fix first, what your ERP already does, and when a quoting app or a custom AI setup is worth it.

How fast do buyers expect a quote?

Faster than most shops deliver. In Paperless Parts’ 2020 Part Buyer Survey, 67% of buyers said they expect a quote in less than 24 hours, up from 53% in 2019. Paperless Parts sells quoting software, and the survey is a few years old, so treat it as a direction, not a law.

Your own numbers matter more. Log a month of RFQs with the time received, time quoted, and won or lost. The gap between those two times is the number to shrink.

Why can’t I just hire another estimator?

Because everyone else is trying to. Deloitte and The Manufacturing Institute estimate that as many as 3.8 million more manufacturing workers could be needed between 2024 and 2033, and 1.9 million of those jobs could go unfilled.

Estimators who can read a drawing, know your machines and catch a spec flow-down are a small slice of that pool. The more practical move is to give the one you have less clerical work.

Where does quoting time actually go?

Mostly around the price, not on it. Before your estimator makes a single judgment call, someone has to:

Most of that is lookup and retyping. The price, the lead time and the decision to bid belong to your estimator.

What should I fix before buying anything?

  1. One RFQ inbox and one log. Customer, part, quantity, due date, received, sent, and outcome.
  2. A ten-minute triage. Decide quickly whether to quote, decline, or ask questions. A fast “no quote” helps the buyer and frees your estimator.
  3. A checklist per part family. Material, stock size, operations, outside processes, inspection, certs and packaging.
  4. A current rate sheet. Machine rates, material markups and outside vendors’ prices, updated monthly.
  5. Standing prices from key suppliers. Agree on price sheets with your main material and heat-treat vendors. If quotes wait on supplier replies, faster drafting won’t fix that.
  6. Findable past jobs. A consistent naming scheme, plus actual hours next to quoted hours on closed jobs.
  7. Follow-up on open quotes. A short note a few days after sending catches the buyers who meant to reply.

What does my ERP already do?

Check your quoting module before you buy anything new. ECI says JobBOSS² quoting lets you create quotes “by copying and modifying previous quotes.” It also gives access to part history, material purchase history and labor costs inside the quoting screen, and converts quotes to orders without retyping.

If you’re on E2, Epicor or another ERP, look for the same two things: copying from a past quote, and pulling actual costs from closed jobs. You may already be paying for them.

Which quoting apps are worth a look?

Two worth knowing, and both are strongest with 3D models.

Paperless Parts analyzes part geometry in CAD models to estimate costs. Its AI tool, Wingman, pulls part numbers, materials and threads from quote packages and flags specs on prints. It lists integrations with JobBOSS², E2, ProShop, Epicor and Global Shop, among others.

Toolpath analyzes an uploaded model and estimates cycle times using your own tooling and cutting parameters. It flags hard-to-machine features and exports to Autodesk Fusion for CAM.

If most of your RFQs arrive as 3D models of machined parts, start here. If they’re scanned 2D drawings, weldments and long customer specs, test these on your own RFQs before you commit.

When does a custom setup make sense?

Custom fits when RFQs arrive as emails, PDF drawings and spec sheets, and your shop’s knowledge lives in past quotes and job folders, not in a pricing engine.

In a custom setup, AI can read the RFQ and drawings for material, tolerances, quantities, finish and cert requirements. It can pull similar past jobs and their actual costs, then draft a quote in your format using your rate sheet.

Your estimator checks the draft, sets the price and sends it. Nothing goes to a customer without that review.

Whatever you test, bought or built, should tell you what it couldn’t read with confidence, such as GD&T callouts, faint scanned notes or revision letters. Your estimator checks those against the print. Missing a sour-service requirement costs more than a slow quote.

What about NDAs and export-controlled drawings?

Ask any vendor, before you upload a single print:

Get the answers in writing and check them against your customer NDAs. For work that can’t leave your building, BlueHill also sets up Private AI: open models running on hardware you own.

How do I set it up, step by step?

  1. Log a month of RFQs with received time, quote time, outcome and estimator hours.
  2. Gather past quotes, won and lost, with their drawings. Fifty to a hundred is a good start.
  3. Write the checklist for each part family.
  4. Clean up the rate sheet so drafts start from current numbers.
  5. Run a side-by-side test. On 20 real RFQs, the app or draft runs while your estimator quotes as usual. Compare line by line.
  6. Set the rules for what always needs your estimator from scratch: new materials, very tight tolerances, new customers.
  7. Track three numbers. Turnaround time, hit rate, and estimator hours per quote.

What could this look like for a 40-⁠person shop?

This is an illustration with made-up numbers, not a client story.

Say you run a 40-⁠person machine shop on Houston’s east side. You get about 30 RFQs a week, and one estimator quotes them with help from the owner. At about 90 minutes each, that’s 45 hours a week, more than one person has.

So quotes go out in four or five days, and some never go out. If drafting cut the lookup and typing to about 30 minutes per quote, your estimator would spend roughly 15 hours a week checking and pricing. That would leave room to quote everything within a day or two, with your estimator still owning every number.

Don’t plan on 30 minutes because an article said so. Your side-by-side test in step 5 gives you the real number.

When should I just buy an app?

Buy, don’t build, when:

Consider a custom setup when your RFQs are mostly PDFs and specs, your pricing depends on past job history, and you want drafts in your own format that feed your ERP.

Want help clearing the RFQ pile?

BlueHill is based in Spring, in north Houston, and works with clients over video and in person around Houston. The Quote Desk reads RFQs and drawings, pulls similar past jobs, and drafts quotes in your format for your estimator to check and send. It’s built to work with JobBOSS², E2 or your ERP, and we confirm yours on the call. See how it fits machine shops and energy services, or book a free 30-⁠minute call.

Bring the job you read about.

Bring one task to a free 30-⁠minute call. We’ll talk through whether AI fits, what it would take and how to get started.

Book a free 30-⁠minute call

Free · 30 minutes on video · no obligation · no tech knowledge needed